Will exhibit chalking after construction epoxy floor project, chalking phenomenon is mainly due to the degradation of powdered rubber surface makes epoxy floor project of the phenomenon. So in the end is what causes it? You should take what measures?

Epoxy Floor engineering chalking the reason is because of factors rubber light, oxygen or ozone aging degradation occurs, so that the binding force between rubber and filler loss that precipitated powdery fillers to the surface. To this end it should be noted that the amount of the inorganic filler is not too much, and the use of appropriate protection system. Coating at atmospheric exposure, absorb ultraviolet light photo-oxidative aging, the polymer film-forming material after aging, not better wetting of pigment, the pigment particles from the film deposited on the surface, become loose powder. Outdoor paint coating to evaluate the main indicators of the quality of aging. Coating outdoor weathering chalk resistance is good or bad with the correct selection of binder material and chalk resistance and the ratio of the strength of the pigment related.

Chalking epoxy floor project after construction has been completed, we can take the following steps to solve:

1, before construction contractors and construction units to make concrete deep communication, avoid inadequate label or the content of the cement floor resulting powder;

2, wear-resistant flooring material selection;

3, add the hardener. Hardener also called concrete sealer, is environmentally friendly colorless or colored liquid (odorless, non-toxic, non-flammable). Can penetrate into the base below the surface 1-3mm, due to its infiltration of the base surface chemical reaction, chemical substances produced by filling a loose original honeycomb structure makes compact entity, so as to achieve wear, pressure, impact resistance, anti- the effectiveness of dust, water, impervious to oil and floor surfaces exhibit high hardness gloss marble make concrete harden permanently cured and sealed. According to solve the problem of wear-resistant floor dusting;

4, epoxy floor construction is completed arrangements for permanent staff regularly conservation.环氧地坪工程施工之后会出现粉化现象,粉化现象主要是由于降解作用使环氧地坪工程橡胶表面粉状化的现象。那么到底是什么原因造成的?又应该采取什么措施呢?

环氧地坪工程粉化其原因是橡胶因光、氧或臭氧等因素作用而发生老化降解,使橡胶与填充剂之间的结合力丧失,以致填料等以粉末状析出表面。为此应注意无机填料的用量不宜过多,并采用合适的防护体系。涂膜在大气曝晒下,吸收紫外光而发生光氧老化,高分子成膜材料老化后,不能更好地润湿颜料,使颜料粒子从漆膜表面析出,成为疏松的细粉。是评价色漆涂膜户外老化性好坏的主要指标。涂膜的户外老化抗粉化性的好坏同漆基材料的正确选用和配比以及颜料的抗粉化性的强弱有关。

1、施工前让混凝土承建商和施工单位深切沟通,避免因水泥标号或含量不足造成的地坪粉化;

2、精选耐磨地坪材料;

3、添加硬化剂。硬化剂也叫混凝土密封固化剂,是环保无色透明或彩色液体(无味、无毒、不燃)。能够渗入基成表层以下1-3mm,因它的渗入与基面发生化学反应,产生的化学物质填充了原本疏松的蜂窝状结构使其成为紧密实体,从而达到耐磨、耐压、耐冲击、防尘、防水、防渗油之功效并且地板表面呈现出大理石的高硬度光泽效果,令混凝土永久地硬化、固化及密封。彻底解决了耐磨地坪起粉之根据问题;

4、环氧地坪工程施工完毕安排固定人员定时养护。